Equipment Allocation

OBJECtive

Equipment Allocation allows the user to allocate equipment to different locations internally (ex: to a project) and externally (ex: to a customer), to return internal and external allocations, as well as internal repairs (ex: to a project) and external repairs (ex: to a supplier) and return internal and external repairs.

 

PREREQUISITEs

 

ICONS

Equipment Allocation icons

Icon

Title

Used to

Display only entered allocations

Display only the non-transferred allocations in the summary section.

Display only assigned allocations

Display only the allocations with an assigned status in the summary section.

Display only finished allocations

Display only the allocations with an assignment finished status in the summary section.

Equipment Inquiry

Access the equipment inquiry screen.

Modify Expected Return Date

Allows for the modification of the expected return date for the current allocations for a selected project.

If, for example, the duration of a project is extended, it is possible to mass change the date of return of all the equipment (or of some of the equipment) that are assigned to this project.

Filter Data According to Specified Parameters

Allows user to filter the breakdown grid data by the specified parameters entered in the Filter section.

Copy the quantities required in the column “Qty to assign”

Allows user to copy the quantities required to the quantity to assign column, for the equipment selected in the breakdown grid.

Reset column “Qty to assign” to zero

Allows user to reset the quantity to assign column to zero, for the equipment selected in the breakdown grid.

Entry of items by bar code

Allows user to enter items by scanning a bar code.

NOTE: Applicable only for Return transaction types.

Billing Deferral

Makes it possible to avoid booking equipment rental costs to a specific project.

See Billing Deferral section.

Configuration

Allows user to configure the functionality of equipment allocation within maestro*.

Only the icons specific to this window are defined in the table below.

 

Summary

For the procedure to follow, click on the hyperlink to:

 

STEPS

  maestro* > Equipment > Equipment Rental > Processing > Equipment Allocation

 

Create an equipment allocation

It is possible to rent equipment for other companies without having to close the opened company to select another company.

  1. Click the drop-down menu in the lower left corner of the window and select another company.
  2. Save the renting and close the window.
  3. Logging on in another company is not necessary.

Only applicable in multidimensional mode.

 

Internal Rental Type

are used to allocate equipment to projects.

 

External Rental Type

are used to allocate equipment to customers.

 

Return of Internal Rental Type

The is used to return the equipment allocated to projects back into inventory.

 

Return of External Rental Type

The is used to return the equipment allocated to customers back into inventory.

 

Internal Repair Type

The are used to allocate equipment repairs to a project.

 

External Repair Type

The are used to allocate equipment repairs to a supplier.

 

Return of Internal Repair Type

The are used to return allocated repaired equipment to a project back into inventory.

 

Return of External Repair Type

The are used to return allocated repaired equipment to a supplier back into inventory.

 

Billing Deferral

This feature makes it possible to defer equipment billing during a specific period; maestro* will no longer generate equipment rental costs to the project.

  1. Click the Billing Deferral icon. The Parameter Selection is displayed.
  2. Enter the number of the project for which the equipment billing will be deferred. Click the button to open a project selection window.
  3. Enter the Start of the deferral period date.
  4. Enter the End of the deferral period date.

If the start and end dates are specified, billing for all equipment allocated to the project will be deferred for that period and will automatically resume on the date indicated as the end of the deferral period. No other procedure is required.

If only the start date is indicated, billing for all equipment allocated to the project will be deferred until the user repeats this procedure and indicates an end date to the deferral period. Equipment billing is therefore deferred indefinitely.

If only the end date is specified, billing that was previously deferred for all equipment allocated to the project will resume starting on the end of the deferral period date. Equipment billing will be reactivated after a deferral.

  1. Click the Accept icon to start processing the data.
  2. The Confirmation of the equipments that needs to be deferred window is displayed. All the project’s equipment targeted by the deferral is listed in the grid; default parameters select all equipment.
  3. If needed, uncheck the box in the Defer column to avoid deferring billing for a specific equipment.
  4. Click the Apply icon.
  5. A confirmation request will be displayed on the screen. The transactions will be generated as soon as the user confirms the equipment billing deferral.

 